This the how great the remodeling job of the old equipment room (which was a shower room when the building was first built) was remodeled into the break room (relocated from elsewhere in the building).
Our "new" break room, which was moved from its previous location as part of an on-going construction project to house additional VISN
(one level higher on the VA organizational chart) assets.
This was the shape the contractors left it in...notice the thick coating of dust on the walls...
And the fantastic work they did on the tiles from the previous use of the room...
Nice, exposed wiring...
A closer view...
Notice the electrical outlets right above the sink? Wonderful compliance with electrical codes I would think.
Notice the dedication it took to even out the floor for the refrigerator...and without hooking up any water lines to it...